![]() biomass, biogas and biofuel plants with an installed capacity of no more than 1 MW,.geothermal power plants with an installed capacity of no more than 0.5 MW,.”Small-scale RES plants” are defined as follows (art. 3468/2006).įor small-scale RES plants in the interconnected system, there is a simplified grid connection procedure. An operating license is issued for a duration of 20 years (25 years for CSP plants) (art. 3468/2006 in conjunction with art.118 par.2h Law No. Apart from that, an electricity purchase agreement is signed between LAGIE, the Greek Electricity Market Operator, and the interested investor (art.Sums up to € 250,000 should be paid in full, while for sums above € 250,000, the repayment conditions are stipulated in the connection agreement (par. In addition, the plant operator must pay the full amount of all grid connection works carried out by ADMIE/ HEDNO.The amount of guarantee letter is defined by the following criteria (par. From January 2015, after the connection contract is signed or even if a final connection offer is received, the plant operator is obliged to submit a guarantee letter.If the connection offer expires, but the plant operator has submitted all the necessary licenses for the finalisation of the connection contract, the connection offer is extended (art.8 par.4 Law No.3468/2006). The interested party agrees on the terms of the connection offer and a connection contract is signed (art. If the RES plant is to be connected to the distribution grid (capacity up to 8MW), the application will be forwarded to the DSO (PPC/HEDNO). The interested party shall also apply to ADMIE (Greek TSO) for a connection offer (for plants with a capacity above 8MW).3468/2006), whereas an EIA is valid for 10 years (art. The installation licence has a duration of 2 years and it can be extended under specific circumstances for two more years (art. Within the same timeframe, the interested party shall apply for an Environmental Impact Assessment (EIA). An installation licence shall be issued by the competent directorate of the administrative region within 30 days (art.The production licence has a duration of 25 years (art. The authority responsible for issuing these licences is the Regulatory Authority for Energy (RAE). 1, 2 GTSC).įor RES plants in the interconnected grid system, the procedure consists of the following steps: The contract shall be concluded according to a procedure specified by law, which applies to all applicants for connection (art. ![]() The plant shall be connected at the economically and technically most suitable connection point.Ĭlaims arise at the date of the conclusion of the contract. The obligated party is the transmission or distribution grid operator in charge (art. This period may be extended by an additional 25 years (art. ![]() This licence is issued by the Ministry of Development for a period of 25 years and shall be approved by the Greek Regulatory Authority for Energy (RAE). Contracting parties can be only those producers of electricity from renewable sources that hold an electricity production licence (art. 267, 268 GTSC).Įvery operator of a renewable energy plant who is a contracting party to a connection contract is entitled to connection. The grid operator is obliged to enter into connection contracts (art. A plant operator is contractually entitled against the grid operator to the connection of renewable energy plants to the grid. There are several grid connection procedures. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |